The calendar now
in use evolved from the Romans. Julius Caesar codified a calendar system that
came to be known as the Julian calendar. In this system, all months have 31
days, except for April, June, September, and November, which have 30 days, and
February, which has 28 days in non-leap years, and 29 days in leap years.
Also, in this system, leap years happened every four years. That is because
the astronomers of ancient Rome computed the year to be 365.25 days long, so
that after every four years, one needed to add an extra day to keep the calendar
on track with the seasons. To do this, they added an extra day (February 29)
to every year that was a multiple of four.
Julian Rule: Every year that is a multiple of 4 is a
leap year, i.e. has an extra day (February 29).
In 1582, Pope
Gregory's astronomers noticed that the year was not 365.25 days long, but
closer to 365.2425. Therefore, the leap year rule would be revised to the
following:
Gregorian Rule: Every year that is a multiple of 4 is a
leap year, unless it is a multiple of 100 that is not a multiple of 400.
To compensate for
how the seasons had shifted against the calendar up until that time, the
calendar was actually shifted 10 days: the day following October 4, 1582 was
declared to be October 15.
England and its empire (including the United States) didn't switch to the Gregorian calendar system until 1752, when the day
following September 2 was declared to be September 14. (The delay was caused
by the poor relationship between Henry VIII and the Pope.)
Write a program
that converts dates in the United States using a calendar of the time and
outputs weekdays. The input will be a series of positive integers greater than
zero, three integers per line, which represent dates, one date per line. The
format for a date is "month day year" where month is a number between
1 (which indicates January) and 12 (which indicates December), day is a number
between 1 and 31, and year is positive number. The output will be the input
date and name of the weekday on which the given date falls in the format shown
in the sample. An invalid date or nonexistent date for the calendar used in
the United States at the time should generate an error message indicating a
invalid date. The input will end with three zeroes.
Sample Input
11
15 1997
1
1 2000
7
4 1998
2
11 1732
9
2 1752
9
14 1752
4
33 1997
0
0 0
|
Sample Output
November
15, 1997 is a Saturday
January
1, 2000 is a Saturday
July
4, 1998 is a Saturday
February
11, 1732 is a Friday
September
2, 1752 is a Wednesday
September
14, 1752 is a Thursday
4/33/1997